WHAT A GRID RISK ASSESSMENT COVERS
Grid Deployment Risk Audit — Scope
Transformer availability: which EU manufacturers have slots for your timeline
RTE connection feasibility: brownfield vs greenfield, timeline estimate, cost range
Site risk profile: HV infrastructure status, capacity absorption by competing projects
Equipment specification: ANSI/IEEE 60Hz compliance for US projects
Timeline reality: realistic commissioning date vs target
Verdict: Go / Proceed with conditions / Reassess
Transformer availability: which EU manufacturers have slots for your timeline
RTE connection feasibility: brownfield vs greenfield, timeline estimate, cost range
Site risk profile: HV infrastructure status, capacity absorption by competing projects
Equipment specification: ANSI/IEEE 60Hz compliance for US projects
Timeline reality: realistic commissioning date vs target
Verdict: Go / Proceed with conditions / Reassess
THE 72-HOUR PROCESS
- You send 5 data points: site location, power (MW), target commissioning date, site status, transformer orders placed
- GridReadiness assesses against current manufacturer lead times and RTE capacity data
- 72-hour delivery: PDF report + 30-minute debrief call
- — no commitment beyond the assessment
WHEN TO GET A GRID RISK ASSESSMENT
- Before committing to a land agreement on a specific site
- Before placing transformer orders — to confirm the right manufacturer and specification
- When an existing feasibility study is more than 12 months old (capacity conditions change)
- When evaluating multiple sites for comparative risk scoring (Full Grid Risk Audit)
RELATED SERVICES
Full Grid Consulting Services · Transformer Lead Times Europe · RTE Connection Timeline
GET A GRID DEPLOYMENT ASSESSMENT
72-hour delivery · Go/No-go verdict for your specific project.
GridReadiness · · June 2026