Transformer lead time 60 months in 2025 12 GW of US AI data centers announced for 2026 only 5 GW under construction France: nuclear power at €50/MWh EU's best grid for AI 25% of announced projects have no power sourcing strategy Délai transformateur HT 5 ans en 2025 Transformer lead time 60 months in 2025 12 GW of US AI data centers announced for 2026 only 5 GW under construction France: nuclear power at €50/MWh EU's best grid for AI 25% of announced projects have no power sourcing strategy Délai transformateur HT 5 ans en 2025

Power Grid Intelligence for AI Infrastructure

Intelligence réseau pour l'infrastructure IA

THE GRID
IS THE
BOTTLENECK

LE RÉSEAU
EST LE
GOULOT

Nvidia delivers. The limiting constraint is high-voltage transformers, switching equipment and grid connection timelines. Before 2020, lead time for a high-power transformer was 24–30 months. Today it stretches to 5 years. That's the real AI bottleneck.

Nvidia livre. La contrainte limitante, c'est les transformateurs haute tension, les équipements de commutation et les délais de raccordement. Avant 2020, le délai pour un transformateur haute puissance était de 24–30 mois. Aujourd'hui : 5 ans. Voilà le vrai goulot de l'IA.

Subscribe to Intelligence S'abonner à la veille Our Services Nos Services
5 ans HV Transformer lead time Délai transformateur HT vs 24 months in 2020
7 GW US data center capacity blocked Capacité data center US bloquée Sightline Climate, 2025
25% Projects with no power strategy Projets sans stratégie électrique 140 tracked projects
€50 French nuclear MWh — EU's lowest MWh nucléaire FR — le moins cher EU RTE baseload 2024

What we do

Ce que nous faisons

FOUR WAYS TO UNLOCK YOUR PROJECT

QUATRE FAÇONS DE DÉBLOQUER VOTRE PROJET

01
MARKET INTELLIGENCE
VEILLE DE MARCHÉ

Monthly lead time tracker for HV transformers, switchgear and grid connection timelines across Europe. The data that doesn't exist anywhere else — built from direct manufacturer contacts and procurement intelligence.

Suivi mensuel des délais transformateurs HT, appareillage de commutation et raccordements réseau en Europe. La donnée qui n'existe nulle part ailleurs — construite à partir de contacts directs fabricants.

Newsletter · From €150/month Newsletter · Dès 150€/mois
02
USED EQUIPMENT SOURCING
ÉQUIPEMENTS DE SECONDE MAIN

Thousands of HV transformers are decommissioned every year by cement plants, steel mills and closed factories. We connect them systematically to data center developers who need capacity now, not in 5 years.

Des milliers de transformateurs HT sont décommissionnés chaque année par des cimenteries et aciéries. Nous les connectons aux développeurs de data centers qui ont besoin de capacité maintenant, pas dans 5 ans.

Brokerage · 3–5% commission Courtage · Commission 3–5%
03
FRANCE SITE SELECTION
SÉLECTION DE SITES EN FRANCE

France has massive structural advantages for AI data centers: nuclear power at €50/MWh, RTE grid connection timelines shorter than most US regions, and available land outside Paris. We identify connected sites — the real scarce asset.

La France a des atouts structurels massifs : nucléaire à 50€/MWh, délais de raccordement RTE plus courts qu'aux US, foncier disponible. Nous identifions les sites raccordés — le vrai actif rare.

Consulting · Retainer + success fee Conseil · Retainer + success fee
04
EU → US EQUIPMENT BROKERAGE
COURTAGE ÉQUIPEMENTS EU → USA

European transformer manufacturers operate on shorter lead times than their US counterparts. We bridge the gap: connecting Pauwels, TMC, Efacec and others directly to US hyperscaler procurement teams before their slot is taken.

Les fabricants européens ont des délais plus courts que les américains. Nous faisons le lien : Pauwels, TMC, Efacec avec les équipes achats des hyperscalers US avant que le créneau soit pris.

Agency · 2–8% commission Agent · Commission 2–8%

THE TRANSFORMER CRISIS NO ONE IS TRACKING

LA CRISE DES TRANSFORMATEURS QUE PERSONNE NE SUIT

When a hyperscaler announces $50B in capex, the market treats it as compute coming online in 18 months. If the transformer order wasn't placed in 2022, that money is a commitment without capacity. You can't pay for a transformer that doesn't exist yet.

Quand un hyperscaleur annonce 50Md$ de capex, le marché le traite comme de la puissance mise en ligne en 18 mois. Si la commande de transformateur n'a pas été passée en 2022, cet argent est un engagement sans capacité. On ne peut pas payer pour un transformateur qui n'existe pas encore.

Electrical equipment represents less than 10% of a data center's total cost and 100% of the bottleneck. GridReadiness tracks this market so you don't have to.

L'équipement électrique représente moins de 10% du coût total d'un data center et 100% du goulot d'étranglement. GridReadiness suit ce marché pour vous.

2019
HV Transformer lead time
Délai transformateur HT
24–30 months
2022
Supply chain disruptions begin
Début des perturbations chaîne logistique
36–42 months
2025
Current lead time — crisis level
Délai actuel — niveau de crise
48–60 months
2028
Earliest capacity release (if ordered now)
Libération de capacité (si commandé maintenant)
TBD

KNOW BEFORE
THE MARKET DOES

SAVOIR AVANT
LE MARCHÉ

For data center developers, infrastructure funds, hyperscaler procurement teams and industrial equipment buyers. Published monthly. First issue free.

Pour les développeurs de data centers, fonds d'infrastructure, équipes achats hyperscalers et acheteurs d'équipements industriels. Publication mensuelle. Premier numéro gratuit.